Resistive-Reactive Load Bank
Resistive and reactive load together, so generators, alternators and paralleling controls are tested the way they really run — at 0.8 power factor and full kVA.
Test the Whole Machine, Not Just the Engine
A resistive test loads the engine but barely asks anything of the alternator and voltage regulator. Real building loads — motors, transformers, drives — draw reactive current too. A resistive-reactive load bank adds controllable inductive load, so the alternator, excitation and paralleling controls are proven at full rated kVA. It is the standard for commissioning critical and paralleled generator plants.
- Independent kW and kVAR control
- 0.8 power factor at full rating
- Proves alternator, regulator and load sharing
- Transient step-load testing
- Data logging for commissioning reports
- Skid or containerized
Resistive-Reactive Load Bank in plain words
What it does
A load bank that adds inductive (reactive) load to the resistive load, so a generator is tested at the 0.8 power factor it is actually rated for.
Pick it when
- You must prove the generator at full kVA, not just kW
- Generators run in parallel and load sharing must be checked
- Specifications call for 0.8 PF testing
Better choice if…
A simple kW test is enough
See the Portable Resistive →What's Included
- Resistive section and reactor section
- Cooling fans
- Main breaker
- Over-temperature, loss-of-airflow, fan-motor overload and control-power-loss protection; element fusing
- Control panel with full power metering
- +PC control with automated test sequences
- +Container housing
- +Medium-voltage connection
Full Specifications
| Parameter | Value |
|---|---|
| Rating | 250 – 6,250 kVA (200 – 5,000 kW + reactive) |
| Power factor | 0.8 lagging at full rating; adjustable |
| Voltage | 480 – 600 V AC |
| Control | Local panel with kW, V, A, Hz readout; optional remote controller and PC software with data logging |
| Protection | Over-temperature, loss-of-airflow, fan-motor overload and control-power-loss protection; element fusing |
Built to Standard
Where It's Used
- Generator plant commissioning
- Paralleling switchgear testing
- Data centres and hospitals
- Marine and offshore generators
- Manufacturer test cells
From design and specification through factory testing, commissioning, and ongoing maintenance — CANDRON delivers at every phase.
- Engineering drawings and coordination studies
- Factory acceptance testing (FAT) with full reports
- Site commissioning and protection settings
- Spare parts, training, and maintenance support
Common Questions
Generators are rated in kVA at 0.8 power factor. Testing at unity power factor never loads the alternator to its rated current, so problems in the alternator, voltage regulator or load sharing can stay hidden.
Ready to Spec
Your Project?
Our engineering team responds with specs, lead times, and pricing the same day. Tell us what you need:
- Generator kVA and voltage
- Number of generators in parallel
- Test standard or specification
- Site access
Send us your project details and we'll respond with a price, lead time, and any clarifying questions — typically within a few hours.
Request a Quote →Or call +1 (647) 616-2595